Huntsman Petrochemicals

Click Case Study No 43 - Huntsman Petrochemicals.pdf link to view the file.

2 MW capacity petrochemical installation, utilisng R1270 (Propylene) as the refrigerant. Hazardous Zone 2 IIB T3 Area environment.

Author: Star Refrigeration